top of page

GILMORE

Location: Burnaby, BC

Size: 50.000 sf

Client: North Cowichan Fire Department

Architect: Gustavson Wylie Architects (GWA)

We are currently rezoning this property in Burnaby to realize Phase 3 of this Research and Development Office Building. Phase 3 adds an additional 50,000 sq. ft. with 1 level of underground visitor’s parking to the existing building, making a total of 130,000 sf of potential R&D Office space. The total parking is well in excess of the requirements in the City of Burnaby for a total of 375 stalls. The building is three stories high with a raised ground floor of 16’-0” to accommodate tenants’ research equipment or necessary higher ceiling space. An extended loading bay has been incorporated to accommodate trucks longer than 35’0”. The building will also have a 5000 lb. The freight Elevator will be constructed of Tilt-up Concrete, Metal panels, and Curtain wall construction. The building was scheduled for construction in 2020.

18148 3555 Gilmore Way V3_8 - North East Facade Far.jpg
220215_18148 3555 Gilmore Way_2 - North Facade.jpg
bottom of page